EPC Partner · India's 500 GW 2030 Target

Empowering
sustainable growth, one site at a time.

Neoserve Projects installs, erects and commissions Wind Power, Solar Power, Hybrid Wind-Solar Plants, PEB structures and EV Fast-Charging Hubs — engineered for India's clean-energy build-out and net-zero industrial decarbonization.

Wind turbines, solar array and battery storage units on a Neoserve renewable energy site
Wind Solar Storage / H2 Grid / EV Hub
500 GWNational RE target by 2030
05Core EPC service lines
15+Industry associations
120+ MWClean portfolio executed
About Neoserve

A proficient engineering force on the solar site, behind the wind turbine, and inside the PEB frame.

Our commitment revolves around effecting measurable environmental change and advancing India's 500 GW 2030 clean energy horizon. Led by seasoned EPC professional Ujjwal Prasad, we execute turnkey erection, commissioning, mechanical mounting, civil foundations, and high-voltage grid connections with zero compromise on safety or compliance.

Read our story →
Aerial view of a large-scale solar power plant
Core Services

Five disciplines, one execution team.

From resource assessment to high-voltage grid synchronization, from heavy crane hoisting to factory handover — Neoserve manages the complete site lifecycle.

01

Wind Power Projects

Resource assessment, multi-section tower hoisting, nacelle & rotor erection, and 33kV pooling sync.

Explore wind →
02

Solar Power Plants

Utility-scale solar farms, C&I rooftops, tracker/fixed MMS racking, inverters, and CEIG approvals.

Explore solar →
03

Hybrid & Green H2 Plants

Co-located wind-solar hybrid facilities, BESS battery storage, and captive power for industrial electrolyzers.

Explore hybrid →
04

PEB Construction

High-tensile structural steel fabrication, rapid assembly, and standing-seam roofs designed for solar loads.

Explore PEB →
05

EV Charging Stations

Highway & depot ultra-fast DC charging hubs, HT step-down transformers, dual CCS2 guns, and cloud CMS.

Explore EV →
Engineering Tool

Renewable Yield & ROI Feasibility Calculator

Estimate annual generation, capex budget, financial payback period, and CO2 emissions offset based on your capacity target and state tariff models.

10 kW (Commercial) 500 kW 2,000 kW (2 MW Utility)
₹10,000 ₹5,00,000 ₹15,00,000+
Engineering Note: Calculations utilize regional Global Horizontal Irradiance (GHI) models, MNRE CUF standards (~19.5% Solar, ~28% Wind), and C&I accelerated depreciation benefits.
Feasibility Output

Estimated Performance & Savings

Recommended Size 100 kW Optimal plant capacity
Annual Generation 155.0 MWh/yr Clean electrical energy
Estimated Capex ₹42.00 - 46.20 L Turnkey EPC estimate
Annual Savings ₹13.18 Lakhs/yr Grid power bill offset
Simple Payback 3.2 Years Fast ROI break-even
CO2 Carbon Offset 127.1 Tons/yr Decarbonization impact

Calculated using regional radiation & tariff models for Gujarat.

Live Operations & Maintenance

Active Plant Generation & SCADA Telemetry

Real-time generation telemetry across Neoserve-managed renewable assets and highway EV hubs.

Updated: Just now
Managed Fleet 120.5 MW Across 4 premier sites
Today's Generation 751.2 MWh Clean grid evacuation
Average Fleet PR 98.8% Performance Ratio
CO2 Offset Today 615.9 T Carbon avoided
Gujarat Kutch Wind Farm (25 MW)
Operational
Category: Wind · Capacity: 25.0 MW
Live Output21,450 kW
Today's Yield188.4 MWh
Performance Ratio98.6%
Telemetry Status1 min ago
Rajasthan Bhadla Solar Park (50 MW)
Operational
Category: Solar · Capacity: 50.0 MW
Live Output46,200 kW
Today's Yield312.8 MWh
Performance Ratio99.1%
Telemetry StatusJust now
Tamil Nadu Hybrid Facility (45 MW)
Operational
Category: Hybrid · Capacity: 45.0 MW
Live Output39,800 kW
Today's Yield245.2 MWh
Performance Ratio97.9%
Telemetry Status2 mins ago
Bengaluru EV Fast Charger Hub
Operational
Category: EV · Capacity: 0.5 MW
Live Output340 kW
Today's Yield4.8 MWh
Performance Ratio99.5%
Telemetry StatusJust now
Proven Execution

Clean Energy Projects Portfolio

Explore hallmark Wind, Solar, Hybrid, PEB and EV charging sites installed and commissioned across India.

How We Work

Turnkey erection & commissioning, step by step.

Every wind turbine raised, solar array synchronized, and EV charger installed follows a rigorous, audited execution protocol.

Site & Foundation

Site preparation, geo-technical survey, component delivery logistics, and heavy civil foundations.

Mechanical Erection

Heavy crane mobilization, multi-section tower hoisting, nacelle fitting, and tracker racking assembly.

Electrical & SCADA

High-tension DC/AC cabling, 33kV pooling substation integration, protection relay testing, and SCADA sync.

Grid Connection & CEIG Handover

Statutory CEIG inspection, net-metering grid connection, commissioning tests, and ongoing O&M support.

Team Experience

Our professionals carry experience from India's leading renewable energy names.

Suzlon Tata Power Adani Envision GE Renewable Energy ReNew Power Senvion Serentica Siemens Gamesa Vestas Enercon Goldi Solar Vikram Solar WAAREE RenewSys
See all associations →

Have a wind, solar, PEB or EV charging site to build?

Connect with Ujjwal Prasad directly or request a technical site audit.

Call +91 82109 67599